Basic concepts and definitions used in JunoViewer Web
Forward Works Programme (FWP) Versioning
Fritz Jooste Administrator Posts: 81
6/29/2015
|
Fritz JoosteAdministrator Posts: 81
A FWP is a programme of works that is defined over a set of segments. In JunoViewer Web, a FWP consists of a table where each row is a different segment. A FWP must belong to a network, and each network can have more than one FWP. These different FWP’s linked to a network can represent different versions of the same FWP, or it could represent work plans associated with different maintenance aspects (e.g. one dealing with road works and another dealing with vegetation control).
Each version of a FWP is regarded as a separate plan. There is no formal or model linkage between two versions of the same FWP. The figure below illustrates this concept:
We recommend you download a FWP template and inspect this to better understand the structure of a FWP in JunoViewer Web.
|
|